Đăng lúc: Thứ sáu - 06/06/2014 20:48 - Người đăng bài viết: admin
Transformer AT1 220kV - 250MVA put into operation safety on 30th November 2013 at 220kV Soc Son substation. This project's owner is The national power transmission corporation, which handed over Electric transmission company 1 as PMU. KD Vietnam took a role as a subcontractor and responsibility for supplying and installation fire fighting system in the project.
Here are some images from the substation


Here are some images from the substation



Những tin mới hơn
- Image on ALS phase 2 project implementation (01/06/2015)
- Prepare for ALS phase 2 project (25/04/2015)
- Working with Bac Ninh fire fighting police department - B01 Que Vo project (29/03/2015)
- Some pictures from KPF factory (06/11/2014)
- Fire fighting item of factory B01 project (26/06/2014)
Những tin cũ hơn
- Inspection and hand over for ALS project (28/03/2014)
- Hand over Namae Vina Electronics Factory (13/03/2014)
- Fire Fighting and Fire Detection systems for Substation (10/03/2014)