
High-class girl hill resort project - LadyHill Resort
LadyHill Resort Sapa High-end resort project - LadyHill Resort Sapa Located right on Nguyen Chi Thanh Street, Phanxipang Ward in Sapa Town is a complex of many tourist service works with an area of 220,000 m2. KD Vietnam Company is honored to be appreciated by the Investor, Binh Tien Consumer Goods Manufacturing Company Limited (Biti's) and signed the contract as the contractor "Supplying and installing central heating system. Warm and ventilated "for the project" "Central Hotel - Lady Hill Hotel"

Long Son Petrochemical Complex Project
KD Vietnam Company, with its extensive experience and prestige, has signed a contract with VNCN CE Construction and Engineering Investment Joint Stock Company on "Supplying and installing works. M&E (including an electrical Fire Fighting plumbing HVAC) "at the Long Son Petrochemical project - Building A1 - Olefins Plant has officially started

Project: “Sapphire palace residence, trading services and office for lease building project” package number 09.
Project: “Sapphire palace residence, trading services and office for lease building project” package number 09. “Supplying equipment and installing air condition system for the commercial floors at number 1,2,3 and 4KT” constructed since January 2017.

Finishing Jasan IIA Project - Jan 2017
Finishing Jasan2a High-grade Socks Manufacture Factory Project in January 2017

Implementing M&E item of Jasan High-grade Socks Manufacture Factory Project Phase 02 (workshop 3, 4)
In the middle of November, 2016, KD Vietnam has signed, carried out and finishied construction M&E of Jasan High-grade Socks Manufacture Factory Project Phase 02 (workshop 3, 4)
Các tin khác
- The process of Sapphire Palace - No.4, Chinh Kinh, Thanh Xuan, Hanoi project (28/06/2016)
- Update on Anco Nghe An project process (28/06/2016)
- Start working at Anco Nghe An (18/04/2016)
- Supply and installation M&E, generator room system-Test house, Foxconn Group, Van Trung IZ, Bac Giang project (28/01/2016)
- Carry out the work of ALS phase 2 project in July (06/08/2015)
- Image on ALS phase 2 project implementation (01/06/2015)
- Prepare for ALS phase 2 project (25/04/2015)
- Working with Bac Ninh fire fighting police department - B01 Que Vo project (29/03/2015)
- Some pictures from KPF factory (06/11/2014)
- Fire fighting item of factory B01 project (26/06/2014)