Vinhomes Skylake Project - Pham Hung
Đăng lúc: Thứ năm - 26/04/2018 01:21 - Người đăng bài viết: admin Vinhomes Skylake Project - Pham Hung
The project is built for the scale: 3 apartment buildings S1, S2 and S3
♦ Total number of apartment: 1800 apartments
♦ The base part has three commercial center floors, apartment floors starting from the 4th floor
♦ Outdoor swimming pool: 400 m2
♦ Swimming pool for the childrens: 100 m2
♦ Conditioning Lake: 32 ha
KD Vietnam contractor is installing HVAC system for S1 and S2 base part of the project.
The project is built for the scale: 3 apartment buildings S1, S2 and S3
♦ Total number of apartment: 1800 apartments
♦ The base part has three commercial center floors, apartment floors starting from the 4th floor
♦ Outdoor swimming pool: 400 m2
♦ Swimming pool for the childrens: 100 m2
♦ Conditioning Lake: 32 ha
KD Vietnam contractor is installing HVAC system for S1 and S2 base part of the project.
We would like to introduce some pictures of the project:






Những tin mới hơn
- Aqua Bay Sky Residences Project (27/09/2018)
- DY Elacen Vina Factory Project (18/07/2018)
- OA Factorty Project - Phase 2 (VSIP Hai Phong Industrial Zone) (24/05/2018)
- Leehing Textile Vietnam Factory Project (21/05/2018)
- Vinhomes Skylake Project - Pham Hung (15/05/2018)
Những tin cũ hơn
- D’. Le Roi Soleil Project - Quang An (23/04/2018)
- D'.Palais De Louis Project - 6 Nguyen Van Huyen (18/04/2018)
- VINFAST Factory Project – Hai Phong (17/04/2018)
- Leehing Textile Vietnam Factory Project (02/04/2018)
- Van Trung Water Pumping Station Project - Bac Giang. (01/04/2018)