Long Son Petrochemical Complex Project
Đăng lúc: Chủ nhật - 15/11/2020 20:27 - Người đăng bài viết: admin KD Vietnam Company, with its extensive experience and prestige, has signed a contract with VNCN CE Construction and Engineering Investment Joint Stock Company on "Supplying and installing works. M&E (including an electrical Fire Fighting plumbing HVAC) "at the Long Son Petrochemical project - Building A1 - Olefins Plant has officially started.
The Long Son Petrochemical Complex Project is invested by SCG Group (Thailand) with a total registered capital of about 54 billion USD, nearly 400 hectares of land, nearly 70 hectares of land with water surface and about 194 hectares of water surface to do Port Construction items will begin to be deployed from November 2019 and synchronously in early 2020. The Long Son Petrochemical Complex is expected to come into operation with a capacity of 950,000 tons of ethylene 400,000 tons of PP 450,000 tons of HDPE 500,000 tons of LDPE per year. The Long Son Petrochemical Complex is expected to come into operation with a capacity of 950,000 tons of ethylene 400,000 tons of PP 450,000 tons of HDPE 500,000 tons of LDPE per year. The LSP project will create 15,000 - 20,000 jobs during its construction. After going into commercial operation in early 2023, LSP will create more than 1,000 jobs and contribute to the national budget of about 2,500 billion VND per year over its 30-year life cycle.
The Long Son Petrochemical Complex Project is invested by SCG Group (Thailand) with a total registered capital of about 54 billion USD, nearly 400 hectares of land, nearly 70 hectares of land with water surface and about 194 hectares of water surface to do Port Construction items will begin to be deployed from November 2019 and synchronously in early 2020. The Long Son Petrochemical Complex is expected to come into operation with a capacity of 950,000 tons of ethylene 400,000 tons of PP 450,000 tons of HDPE 500,000 tons of LDPE per year. The Long Son Petrochemical Complex is expected to come into operation with a capacity of 950,000 tons of ethylene 400,000 tons of PP 450,000 tons of HDPE 500,000 tons of LDPE per year. The LSP project will create 15,000 - 20,000 jobs during its construction. After going into commercial operation in early 2023, LSP will create more than 1,000 jobs and contribute to the national budget of about 2,500 billion VND per year over its 30-year life cycle.
Below are some Pictures at the project:









Tác giả bài viết: Nguyễn Hiên
Nguồn tin: KD Vietnam Company Limited
Nguồn tin: KD Vietnam Company Limited
Những tin mới hơn
Những tin cũ hơn
- Inauguration of Son La high-tech fruit and beverage factory project (15/11/2020)
- Acceptance and handover of Industrial air conditioning system, Fire alarm system - Unit 330kw (30/12/2019)
- Checking and accepting the electrical system and handing over the Housing Project for officials and employees - Governmental agency Committee Le Van Luong (30/12/2019)
- Son La High-Tech Fruit Drinks and Fruits Processing Factory Project (21/11/2019)
- Uong Bi Thermal Power Plant Project (20/11/2019)