Dung Quat – Textiles Xindadong Fabric Manufacturing Factory Project
Đăng lúc: Thứ hai - 18/11/2019 22:20 - Người đăng bài viết: admin On June 20,2019, KD Vietnam Co.,Ltd signed a contract with the general contractor: Bong Sen Vang Joint Stock Company for the project:” Dung Quat – Textiles Xindadong fabric manufacturing factory project” at A1, 6A Street Vsip Quang Ngai, Quang Ngai about:” Mechanical and Electrical Construction” with items: Light electrical system, Water supply and drainage system, Steam system, Pneumatic system, Lighting system and socket, guard house machanical and electrical system.
The project has an area of 15ha, of which floor area accounts for 6ha and construction time is 5 months.
The project has an area of 15ha, of which floor area accounts for 6ha and construction time is 5 months.




Những tin mới hơn
- Acceptance and handover of Industrial air conditioning system, Fire alarm system - Unit 330kw (30/12/2019)
- Checking and accepting the electrical system and handing over the Housing Project for officials and employees - Governmental agency Committee Le Van Luong (30/12/2019)
- Son La High-Tech Fruit Drinks and Fruits Processing Factory Project (21/11/2019)
- Uong Bi Thermal Power Plant Project (20/11/2019)
- Acceptance Fire Prevention And Handover Golden Park Project (20/11/2019)
Những tin cũ hơn
- Hai Duong Complex An Phat Factory Project (18/11/2019)
- TATING PLASTIC Factory in Vsip Industrial Park. Hai Duong (10/11/2019)
- The project Housing quarters officials and staff of the governmental information security Department (22/05/2019)
- Aqua Bay Sky Residences Project (27/09/2018)
- DY Elacen Vina Factory Project (18/07/2018)