Long Son Petrochemical Complex Project
KD Vietnam Company, with its extensive experience and prestige, has signed a contract with VNCN CE Construction and Engineering Investment Joint Stock Company on "Supplying and installing works. M&E (including an electrical Fire Fighting plumbing HVAC) "at the Long Son Petrochemical project - Building A1 - Olefins Plant has officially started

Son La High-Tech Fruit Drinks and Fruits Processing Factory Project
With experience, reputation accumulated over many years of operation, on September 16,2019, KD Vietnam Co.,Ltd has signed a contract with General Contractor : VNCN C&E technical and construction investment Join Stock Company about: “ Supply and install construction M&E systems” for project “Son La high-tech fruit drinks and fruits processing factory project”

Dung Quat – Textiles Xindadong Fabric Manufacturing Factory Project
At the end of June 2019, KD Vietnam Co.,Ltd signed a contract with the general contractor: Bong Sen Vang Joint Stock Company for the project:” Dung Quat – Textiles Xindadong fabric manufacturing factory project” at A1, 6A Street Vsip Quang Ngai, Quang Ngai about:” Mechanical and Electrical Construction” with items: Light electrical system, Water supply and drainage system, Steam system, Pneumatic system, Lighting system and socket, guard house machanical and electrical system.

TATING PLASTIC Factory in Vsip Industrial Park. Hai Duong
On January 16, 2019 KD Vietnam Co., Ltd. and Bong Sen Vang Construction Joint Stock Company started to sign and deploy the project package: "Execute electrical and mechanical works for TATING PLASTIC Factory in Vsip Industrial Park. Hai Duong '' with the progress of finishing the project on April 30, 2019The factory project with an area of 17,000m2, including 2 factories, each factory is 6000m2; there is a 3-storey Office building with 420m2 / floor; 2-storey dormitory with 1500m2 / floor; and other auxiliary areas with an area of about 300m2.
update implementation progress in D’. Le Roi Soleil – Quang An Project
At the end of November 2018 - D '. Le Roi Soleil project, with address at No. 2 Dang Thai Mai, Quang An Ward, Tay Ho District, Hanoi city is being completed each apartment to hand over to customers, completed on schedule in February 2019.
Các tin khác
- The project Housing quarters officials and staff of the governmental information security Department (22/05/2019)
- Geshen Vietnam factory project (27/03/2018)
- DS Global Vina Project - Dai An Industrial Zone in Hai Duong City. (11/04/2017)
- The process of Sapphire Palace - No.4, Chinh Kinh, Thanh Xuan, Hanoi project (28/06/2016)
- Update on Anco Nghe An project process (28/06/2016)
- Start working at Anco Nghe An (18/04/2016)
- Working progress in workshop No.11, Van Trung IZ, Bac Giang (13/04/2016)
- Update implementation progress in Workshop No.11, Van Trung IZ, Bac Giang project (23/03/2016)
- Sapphire Palace Building - No.4 Chinh Kinh, Thanh Xuan, Ha Noi Project (23/03/2016)
- Supply and installation M&E, generator room system-Test house, Foxconn Group, Van Trung IZ, Bac Giang project (28/01/2016)