
Acceptance Fire Prevention And Handover Golden Park Project
This is the 8th project that KD Vietnam has been acceptanced for fire prevention in 2019. KD Vietnam Co.,Ltd has completed acceptance fire prevention on Tuesday October 29,2019 at Golden Park project – Que Vo – Bac Ninh and meet the schedule given by the investor.

Deploying package number 7 of Sapphire Palace project
“Sapphire palace residence, trading services and office for lease building project” package number 7: “Supplying equipment and installing air condition system, underground ventilation, pressurization ventilation, smoke suction, pressure boosting, fire prention door, sewage litter tube.”

Eva Hai Phong Factory Phase II
In November 2016, besides Jasan IIA project, KD Vietnam starts signing and implementing packet: "Construction of EVA Hai Phong Factory" at VSIP, Thuy Nguyen District. This project finished in December, 2016.

Srithai project in VSIP IZ, Bac Ninh
Srithai project are signed between KD and Giza Vietnam at VSIP IZ, Bac Ninh was started from...

Carry out the work of ALS phase 2 project in July
Up to July, ALS phase 2 project are carried out some works in drainage system, installing of ventilation fan and electric panel in multi-function house.
Các tin khác
- Image on ALS phase 2 project implementation (01/06/2015)
- Prepare for ALS phase 2 project (25/04/2015)
- HVAC in Nui Phao Mining Site, Thai Nguyen (10/03/2014)